Additional Images

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

Fuel Injector

DDP.AE-1
Please Call for Availability
775-753-6429

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Details

Categories

Shipping Information

  • Item Requires Shipping
  • 27.0 lbs.
  • W17.0000” x H9.0000” x L12.0000”

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.