Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel
Fuel Injector
DDP.AENEW
Please Call for Availability
775-753-6429
Description
Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.
Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
- Not For Sale In California
Details
- DDP.AENEW
- DDP.AENEW
- Dynomite Diesel
- New
Categories
Shipping Information
- Item Requires Shipping
- 4.0 lbs.
- W3.5000” x H3.5000” x L10.5000”
Customer Reviews
Total Reviews (0)
You must login to post a review.
Write the First Review!